The picture below shows the engine frames being lifted at the front end, the first task is to remove the slave bogie.
Slave bogie out.
Manual labour, the slave bogie being pushed out of the way.
Followed by the front bogie being pushed towards the engine.
Positioning the bogie under the frames.
Lowering the frames onto the bogie.
The levelled frames, now ready to receive the driving wheels. The frames will be lifted using the jacks in the carriage repair shed. The front bogie has been fitted to provide stability on the journey from the engine shed, to the carriage shed.
The rear splasher for the front bogie has been fitted, allowing the rear cylinder cover to be fitted. This is the right hand side.
Repeated then with the left hand side.
Side view left hand.
And side view right hand.
The big lift to install the driving wheels is set for 20th December.