The riveting gang with smiling faces, they have just completed riveting the smoke box saddle into its place between the frames.
Hard on the heels of the saddle was the arrival of the cylinders.
The cylinders had been away to have the valve liners re-positioned.
The left hand frame, prepared to receive the cylinder.
The left hand cylinder being hung into its position.
The front end, fully riveted together with both cylinders fully bolted to the frames.
More lubrication pipes added.
More fittings added.