On tuesday 18th May, 5025 went on a run down the line, testing and gauging. This is a pictorial record of the day.
At Aviemore shed.
Boat up platform
Boat down platform
Taking water at Boat
Checking the clearance at Tullochgorum bridge
A tight fit.
Another tight fit at Broomhill bridge
At Broomhill station
A series of pictures taken at the end of the extension on Dulnain bridge.
L to R, Paul, Tom, Nathan & Benny
On the extension between Dulnain and Broomhill
Between Boat and Aviemore
After the light engine runs, a set of coaches were collected for the first loaded test run. Seen here at Speyside.
Running round at Broomhill
Backing towards the train
Backing towards the carriages
Preparing for departure
A successful day.