The main news for this week is that the steel plates for the rear frames have arrived.
Below;Jack is drilling the holes in the new plates, using the old plates as a pattern.
The picture below shows another view of Jack drilling the holes with Nathan supervising.
The rear of the frames, profiled ready to receive the new plates. This is the area in which the drag box which forms the cab floor will be fitted.
Other work this week has been on the dismantling of the cab roof. Some of the plates where mouldings were fitted had rusted through and will be replaced.
The cab roof where repairs have started, part of which has been painted with red oxide primer.
Note; Owing to holidays, the next news will be mid August.